Five work samples from operations.

Concept work with fictitious data. It shows how we work and is not a client reference.

Interactive work sample

Will Friday hold?

The pilot start is promised for Friday, 22 Nov. Two sources give different approval dates – and that decides whether the date holds. Tap the IT security message.

Project control · order processing pilotSimulation · fictitious data
Data interface approvalMon 18 Nov
Test with real data2 daysTue 19 Nov–Wed 20 Nov
Pilot startPromised: Fri 22 NovFri 22 Novholds · 1 day buffer

Original project status: the plan expects the approval on Monday.

Nothing changed yet.

What may an external AI see of this?

A model is to draft a status report for the project lead from the message. Choose which path the text may take.

Stays inside the company

Original IT security sentence with sender and reason (155 characters).

Goes to Service A (simulated)

Who decides

Follow it in the knowledge graph →Opens the full work sample with the same source and decision.All model paths in detail →
Simulation · fictitious dataProject control

What does a single message change across the whole project?

According to the plan, the pilot starts on Fri 22 Nov. Next to it lies a new message from IT security.

  1. Gather knowledge
  2. Explore the connections
  3. Take control

Drag the new message into the project status – or tap “Place message”.

  • needs – waits for its predecessor
  • sets the date
  • evidence – taken from the source
  • outdated – replaced by a newer source
  • parallel – runs independently
  • changed by your action

Effect on the schedule

Place the message first – then the timeline shows what it shifts.

Without measureFri 22 Nov
With measureFri 22 Nov
Friday reachable, 1 working day of buffer
Try other approval days
ChangedNothing changed yet – start with the message.

Project tree with responsibilities

IT security
Data interface approval
Data team
Legacy order migration
Quality assurance
Workflow tests passed
Test with real data
Business team
Clerk training
Project lead
Pilot start

A model can draft the status report – the scheduling logic calculates the date.

Which approval regularly holds up a project for you?

Outline your own case in the short brief – three details are enough. Nothing is taken over from this simulation.

Open the short brief →
More work samples: workshop planner · project inbox · sensor ↓
Interactive work sample · fictitious data · Software & design

One shared plan.

Workshop plannerHall 1 · Test bench 2
Job, customer, machine …Thursday, week 48
Waiting for parts1
A-116Medium
Pump P3 – bearing
Harbour Ops SouthParts from FriTS
Done1
A-109Normal
Update control
Brandt HydraulicsacceptedMK
Today3
A-118High
Check valve block
Brandt Hydraulics13:00MK
A-121Medium
Replace seal kit
Nordwerk Pumps17:00TS
A-124Normal
Safety check press 4
Internal16:30MK
Test bench 2 · today2 h idle
2 h idleA-118A-121
121314151617181920
Work sample · fictitious data SketchApplication
Drag the slider
Starting pointA-118 first – parts only arrive at 15:00. Test bench 2: 2 h idle.
EffectAfter your action, the effect appears here.
Interactive work sample · fictitious data · AI & knowledge

Knowledge with a source.

Starting pointCustomer request: bring commissioning forward to Thursday? Answer open.
EffectAfter your action, the effect appears here.
Project inboxInteractive demo · fictitious data
1Inbox
JH
J. Hansen · Hansen Plant Engineering (fictitious)today, 08:14
Commissioning hall 3

„Could you bring commissioning forward to Thursday?“

Benefit: the application checks the project plan, shows the source and prepares a reply and a task – you decide.

Nothing is sent or stored. Everything runs locally in this page.

2Source

Project plan P-2041 · Conveyor system hall 3

  1. Conveyor installationcompleted
  2. Electrical inspection – technical approvalopen · owner: electrician
  3. Commissioningplanned Friday · 1 day buffer
  4. Operator trainingFriday afternoon
The source appears after the check

Result of the check: Thursday is possible in the schedule. The technical approval of the electrical inspection is still missing.

3Suggestion – you decide
Draft replyA draft reply with reasoning will appear here.
Task for the project leadA task with a deadline will appear here.
Draft replySuggestion
Source: project plan P-2041, line 2
Task for the project leadOn time
Obtain technical approval for electrical inspection, hall 3
Source: project plan P-2041, line 2
Open tasks – project lead 2
  • Approve test report conveyor 2
  • Send training documents to Hansen
Interactive work sample · fictitious data · Connected products

Signals into action.

Sensor V-2 · Pump P3
Sensor V-2 · Pump P3live
Vibration (mm/s), last 14 days
Limit
Vibration has been rising for 3 days. Likely cause: bearing wear.
Starting pointVibration on pump P3 rising for 3 days – no decision yet.
EffectAfter your action, the effect appears here.
Collaboration

Discuss a similar workflow with us.

Which decision costs your team too much coordination? Prepare your request in a few minutes – if you like, with a short brief in three answers.

Wilkens Engineering · technical lead: Dirk Wilkens · Kiel

Sketch a project

Three short answers are enough. They become a short brief you can edit and carry over into the project enquiry.

Your draft stays on this device. Nothing is sent.

Contact